AMPERA builds factory-made power systems for operators that need reliable on-site electricity. It serves data centers, defense sites and maritime operations. Industrial users are its fourth market. Near-term units use conventional fuel or recovered heat, while a future version uses a sealed thorium reactor module.
Brian Matthews is chief executive officer, while James Ross is president. Worldwide operations occupy nearly 100,000 square feet across two buildings in Palm Beach Gardens, Florida. The site combines five functions, including research, engineering and assembly.
Funding Rounds (SEC Form D)
| First sale | Filed with SEC | Amount sold | Investors | Avg. check | Terms | Filing |
|---|---|---|---|---|---|---|
| Nov 6, 2026 | Nov 20, 2026 | $2,000,000fully sold | 24 | $83,333 | Convertible NotesRule 506(b) | Form D ↗ |
First sale is the date the first investor in the offering committed to invest. Companies must file Form D within 15 days of that date, so filing dates run later.
Leadership Team
Executive officers and directors listed on Ampera's Form D filed Nov 20, 2026.
Who Invested in Ampera
Scroll table to see all columns →
| Announced | Round | Amount | Lead | Other investors | On the Form D | Source |
|---|---|---|---|---|---|---|
| Nov 17, 2026 | PIPE and pre-transaction financing tied to a proposed business combination | More than $40 million committed; up to approximately $357 million in gross transaction proceeds | — | Unnamed institutional, accredited and strategic investors | [2] |
Announced amounts can differ from Form D figures: an announcement can combine several closings, and some money is raised without a Form D.
Why Investors Backed Ampera
Investors are betting on new power supply for AI infrastructure, data centers and industrial electrification. AMPERA's case pairs near-term commercial generation with longer-term nuclear development. Its PIPE was anchored by strategic investors from the markets it plans to serve. [2]
“The advanced technology and additive manufacturing used demonstrate a clear commercial path for new nuclear technology coming to market in an accelerated manner.”
Origin and Team
Brian Matthews founded AMPERA. [2]
Product and Technology
The power-conversion module circulates carbon dioxide in a closed loop rather than using steam. AMPERA calls it sPower. The PowerNOW line pairs it with conventional fuel or recovered heat. The platform accepts seven fuels, including gas, diesel and hydrogen. Its first model targets 7.5 megawatts and fourth-quarter 2027 production. A later model targets 15 megawatts. [1][2]
AMPERA plans to fabricate, integrate and test modules in one factory before shipping them by truck. A licensed nuclear module can later replace the conventional heat source while keeping the same power block. The design also keeps the same site and grid connection. [1]
The future nuclear module uses a silicon-carbide core with a 3D-printed gyroid shape and tiny channels. It operates below a self-sustaining reaction and uses an external neutron source, allowing immediate shutdown. Its safety design reduces reliance on active systems and operator intervention. Its sealed thorium fuel core targets 30 years without refueling. Planned modules offer 7.5 or 15 megawatts. AMPERA expects nuclear systems to reach 30 megawatts and plans larger configurations. The systems use AI-driven controls. AMPERA has targeted customer delivery of its mobile nuclear reactors by 2030. [1][3][4]
The power block targets 50% to 60% efficiency and a 50% size reduction through additive manufacturing and nickel superalloys. AMPERA cites 20 years of research and thousands of operating hours behind it. At scale, AMPERA targets a long-term power cost near $20 per megawatt-hour and capital cost of $1.7 million per megawatt. These figures are targets, not demonstrated commercial results. [1]
Use of Funds
- AMPERA plans to use transaction proceeds for platform development and its initial commercial scale-up. [2]
Milestones
Scroll table to see all columns →
| Date | What happened | Source | Coverage |
|---|---|---|---|
| Nov 17, 2026 | AMPERA and Berto signed a definitive business combination agreement valuing AMPERA at about $900 million before new equity. They target a first-quarter 2027 close and ticker AMPR, subject to approvals. | [2] | POWER ↗Kalkine Media ↗TradingView ↗ |
| Jul 2, 2026 | AMPERA completed and unveiled its first full-scale, 3D-printed nuclear reactor module at its Palm Beach Gardens center. | [4] | — |
| Jun 2026 | AMPERA established an Australian subsidiary to secure thorium supply and support U.S. nuclear fuel production. | [4] | — |
| Jun 2026 | AMPERA introduced its Integrated Energy Architecture for waste-heat recovery, conventional-fuel generation and future nuclear power. | [4] | — |
Market
AMPERA management estimates U.S. electricity use will grow 64% by 2035, while generation rises 26%. It projects a 1,574-terawatt-hour gap, equal to about 180 gigawatts of continuous capacity. The estimate uses public ICF and NextEra presentations and assumes the new capacity runs continuously. [1]
We wrote this summary from public statements by Ampera and its investors. It is not investment advice.
Sources
- CompanyAMPERA technology and products · linked above ↑
- PressAMPERA and Berto proposed business combination
- PressAMPERA headquarters announcement
- PressAMPERA reactor-module milestone
- SECAmpera Form D, filed 2026-11-20 · linked above ↑
- SECAmpera, Inc. /GA filing history